Tuesday, January 26, 2010

Catching Up

Finally, an update from the coast! It's been 3 months since the last post so for this one I'll show you what happened in Nov. and hopefully do a Dec. update in a day or two. So here goes...

We had our granite installed in our shower. That was quite a job and required 4 men to lift and put into place the largest slab. Boris (our "granite guy extrordinaire") said that it weighed about 500 lbs. The other 2 slabs were half the size, so you do the math. We're really pleased with how it turned out but how can you go wrong with green granite!

Cliff installed brick shaped travertine tiles above the granite to the ceiling and also on the stem walls (foundation) that are in the bathroom. The stem walls are concrete and not too pretty so we had to cover them with something. They look gorgeous covered with these tiles!

We put the bathtub in place but haven't done any finishes in this bathroom because we're focusing on the master bathroom first.

These lights are outside of our master bedroom which looks out to the ocean. Very nautical and we love the look.
And last but certainly not least here is the newest addition to our family, Daniel Ryan Trzeciak. He was born on Oct. 27, 2009. This picture was taken at Christmas when we were up in Wa. visiting our kids and grandkids. Daniel is a really good baby, very laid back. He gave us all a scare when he had to have hernia surgery at 3 weeks old, but he came through it fine.
I hope to post again in a day or two with the Dec. goings on so check back soon!





1 comment:

Jen said...

I love the subway tiles, very cool. I like the lights too.

Good to see what's going on up there!